Student Attendance Plan

Where Students Will Attend School

During the construction period, Allen Middle School students will attend school at two locations: Cedar Cliff High School and New Cumberland Middle School.

At Cedar Cliff High School, one grade level of Allen Middle School students will be housed in a designated, first-floor wing that will be used exclusively for middle school instruction. This area will operate as a self-contained space with dedicated classrooms, supervision, and access to student support services. Allen Middle School staff will remain with students, and schedules will be structured to maintain age-appropriate learning environments and routines.

The remaining Allen Middle School students will attend New Cumberland Middle School, where they will be fully integrated into the middle school setting. This approach allows students to learn in a building designed specifically for middle school grades while maintaining consistent academic programming and support services.

Both locations were selected after careful evaluation of safety, instructional continuity, transportation logistics, available space, and the ability to support students’ academic and social needs. Additional details regarding grade-level placement, transportation, daily schedules, and student supports will be shared with families well in advance of the transition.

Student Attendance Plan (Through 2030)

The District has developed a comprehensive, multi-year student attendance plan extending through 2030 to support the Allen Middle School renovation and the broader long-term facilities plan. While renovations are planned as a two-year project, the attendance plan intentionally includes an additional year of flexibility to account for potential construction delays or other unpredictable factors that can occur with large-scale projects. (See image below.)

What this looks like year by year:

  • Year 1 (Construction Begins):
    Allen Middle School students will attend school at New Cumberland Middle School and Cedar Cliff High School according to their grade level. This arrangement ensures stable learning environments with consistent staff, schedules, and student supports.

  • Year 2 (Construction Continues):
    Students will remain in their assigned locations to minimize disruption and avoid unnecessary transitions. Academic programs, extracurricular activities, and support services will continue without interruption.

  • Year 3 (Contingency Year, If Needed):
    If construction is completed on schedule, students will return to Allen Middle School. If delays occur, the plan already provides flexibility, allowing students to remain in familiar placements without sudden or last-minute changes.

This approach prioritizes predictability and stability for students and families. By planning ahead and building in flexibility, the District can respond effectively to construction timelines while maintaining safe, supportive, and consistent learning environments. Families will receive regular updates and advance notice of any adjustments to ensure transparency throughout the project.

The image below illustrates the year-by-year attendance plan for grades 3–8 that may be affected by construction and renovations, as presented to the Board of School Directors in December 2025. The blue-highlighted section (2028-2029) represents an additional year included as a contingency to accommodate potential construction delays or other unforeseen challenges common in large-scale projects. While the plan is intended to cover two school years, this extra year ensures flexibility. If the schedule proceeds as planned, middle school students previously attending New Cumberland and Allen Middle Schools will return to Allen Middle School in 2028-2029.

© 2026. West Shore School District. All Rights Reserved.
View text-based website